Goals and Key Results
Goals say what the studio wants to be true by the end of a period. Each one’s key results say how you’ll know it is: “50,000 wishlists”, “the vertical slice done”, “fewer than 20 open crash bugs”.
Goals open from the Goals button in Tasks → Production → Milestones, beside New milestone.
Setting a goal
Section titled “Setting a goal”- Type the goal at the top, such as “A launch the store notices”, and press Add goal. It takes the current quarter as its period.
- Press Edit on it to set its owner, team and dates. You can also pick the goal it serves and its wiki page.
- Press Add a key result for each way you will measure it, and pick what it is Measured by.
Every change is kept as you make it. Until a key result is complete, such as one with no milestone picked yet, the goal says what is missing.
What a key result can measure
Section titled “What a key result can measure”| Measured by | What it reads |
|---|---|
| A milestone’s done tasks | The share of the milestone’s tasks that are done, its sub-milestones included |
| Tasks that match | How many tasks match a formula, in the same language as the board’s views: type = "bug" AND NOT done |
| A figure of Insights | A count, sum, average, minimum or maximum over an Insights source, such as the wishlists an automation brings in |
| Check-ins | The value its owner last gave |
A key result runs from From to To. To bring a number down, such as a crash rate, set To below From.
Checking in
Section titled “Checking in”Press Check in on a goal. Say how it is going: On track, At risk, Off track or Done. Add a note, and a new value for each key result that is measured by check-ins. The goal’s status is its last check-in’s. Before any check-in, kumo compares how far the goal has come with how much of its period has passed.
Each goal also draws its progress over time. The studio’s server records it once a day.
Who can change a goal
Section titled “Who can change a goal”Everyone who can see the board sees its goals. A goal is changed, checked in on and deleted by:
- whoever made it;
- the people and groups it names under Who can change it;
- whoever manages the project’s access.
Goals in a wiki page
Section titled “Goals in a wiki page”Show the goals live in any page with a kumo block:
```kumoview: goalswhere: status = "at-risk" OR status = "off-track"show: [title, owner, progress, status]```